Let me adjust the cost estimate based on the new prices for metal sheets, blocks, and the availability of timber:
No changes in this section.
Total Foundation Cost: Ksh 98,850
Other material costs remain the same.
Adjusted Total Wall Construction Cost:
New Total Wall Construction Cost: Ksh 143,950 (previously Ksh 174,200)
Since timber is available, no need to account for purchasing timber.
Adjusted Total Roofing Cost:
New Total Roofing Cost: Ksh 47,960 (previously Ksh 71,190)
No changes in this section.
Total Flooring Cost: Ksh 40,300 (without tiles) or Ksh 90,700 (with tiles)
No changes in this section.
Total Door and Window Cost: Ksh 59,000
No changes in this section.
Total Plumbing and Electrical Cost: Ksh 85,000
No changes in this section.
Total Finishing Cost: Ksh 85,040
New Estimated Total: Ksh 559,100 (without tiles) or Ksh 609,500 (with tiles)
These adjustments reflect the lower cost of blocks and metal sheets, and the availability of timber, resulting in lower total construction costs.